Inverlochlarig Farm

Type of Project

Bridge Replacement

Location

Inverlochlarig Farm

Replacement of a washed-away pedestrian/ATV bridge in a remote upland glen within Loch Lomond and The Trossachs National Park. Due to challenging access, the bridge beams had to be split into three sections for transport to site. The bridge height was also raised compared to the previous structure to improve flood flow capacity.

Relevant stats
- 18.4m span
- Main steel beams weighing 1.9 tonnes each
- 120 No. M20 HSFG splice bolts (Tension controlled)

Services provided
- Planning Permission
- Bridge Design and Detailing
- Tender Documents
- Contract Management