Allt a’Mhullin Hydro
Type of Project
Hydro Scheme
Location
Loch Broom
This project involved the detailed design of civil engineering works for a 100kW community hydroelectric scheme. The site was located on steeply sloping, forested terrain above the A835 in Wester Ross. The design addressed the unique challenges posed by the site's topography and environment, ensuring sustainable and efficient integration of the hydro scheme into the surrounding landscape.
Relevant stats
- 100kW run-of-river hydro
- BroomPower began generating energy in October/November 2017
- Expected annual generation 0.45MWh
- Community-owned renewable energy scheme by Lochbroom Community Renewables Ltd
Services provided
- Structural Design and Detailing:
- Intake Structure
- Pipe Bridge
- Pressure Pipeline
- Powerhouse Superstructure
- Turbine/ Generator Foundations.
- Outfall Structure
- Access Roads
- Compliance with SEPA CAR License
- Preparation of Tender Documents
- Geotechnical Stability Assessment