Deanston Hydro
Type of Project
Hydro Scheme
Location
Deanston Distillery
The Deanston hydro scheme at Deanston Distillery, designed by Campbell of Doune Ltd in 2020, involved a new 400kW Kaplan Hydro turbine within the historic 1832 'Powerhouse' building. The project involved modifications to the historic overhead cast iron pentrough and masonry underground tailrace channels. The works were designed to replace a Fancies Turbine dating from the 1940s, while preserving the site’s heritage.
Relevant stats
- 400kW Kaplan Turbine supplied by Gugler (Austrian)
- Original Infrastructure Date: 1832 (Powerhouse building), 1940s (hydro scheme)
- 3D laser scanning technology to map historic infrastructure
Services provided
- Hydro Scheme Appraisal
- Hydro Scheme Design and Detailing
- Tender Documents
- Civil Engineering Contract Management